Crown Point Depot, Norwich


Trackwork were employed by Taylor Woodrow to supply and install the permanent way & associated trackside civil works.

The Crown Point Depot project comprises of the conversion and extension of the existing facilities to provide servicing, maintenance and stabling for a new fleet of trains.

The trackside civil engineering scope of works included:

  • Construct 750m aggregate pedestrian walkways
  • Construct 9 Nr. pedestrian track crossings
  • Pre-casting off-site and installation of 50 Nr. lighting bases
  • Installation of 50 Nr. lighting columns
  • Installation of 600m galvanized pallisade fencing

Time & cost savings were made by fabricating the lighting bases off-site at our Doncaster facilities, and transporting them to site by Unimog and lifting into place with RRV’s.