The contract formed part of the MAFA 3 package of works – South East Trains Lengthening Programme (SETLP) which was required to deliver enhancements to the existing network to facilitate longer trains.
The S&C remodelling was located on one of the busiest commuter routes in London at Selhurst Station on the Victoria and Brighton Line. The work was completed during 3 no. 52 hour possessions.
The scope included:
Removal and plain lining of existing DV15 crossover
Installation of modular DV15 crossover using Kirow 1200 rail crane and tilting wagons
Renewal of 400m of track including 3rd rail
Welding and stressing
Design, installation, maintenance and removal of TSR’s