Long Marston Rail Innovation Centre Infrastructure Upgrade
Porterbrook, the UK’s leading rolling stock financier and asset management company, appointed Trackwork Ltd as the principal contractor for a major redevelopment of its 135-acre mainline-connected site, bringing the company’s investment in the site to £75m.
The project offers several improvements to the existing rail facility inluding:
Individual outer and inner loops
Remodelled access to the existing sidings from the new inner loop
8 No. 400m+ new stabling sidings
2 No. 200m+ new electrified stabling sidings
New track connecting the site east to west, providing an opportunity to both turn rail vehicles and bypass other infrastructure
Trackwork were appointed for Grip 2 Feasibility Study Design through to GRIP 5 detailed Design, and construction of the Civils and Permanent Way Works. The S&C and track materials were manufactured and/or supplied by trackwork.
Replacement and reconstruction of Middle Road Culvert
Track formation, including excavation of 25,000m3 of material
The permanent way scope of works included:
11km of new track on 17,000 sleepers
Installation of 37,000 tones of ballast
Design, manufacture and installation of 10 No. buffer stops
40 No. switch & crossings units (manufactured in-house by Trackwork)
Level Crossing replacement
Associated civils works including road modifications, walkways, troughing, culverts etc