Materials
Trackwork
has always recognised the value of recycling railway materials both
from an engineering and Environmental point of view. The new 16.5
acres premises in Doncaster with 2,500,000 cu.ft of undercover storage
means that a vast range of new and serviceable permanent way materials
are always available from Stock.
From
these extensive stocks Trackwork prefabricates complete turnouts, new
or serviceable on timber or concrete bearers ready for inspection
prior to dismantling for despatch.
All
sections of rail can be cut, drilled, cold expanded for fishplates and
ultrasonically tested.
As a major
stockist of both new and serviceable railway sleepers/timbers
Trackwork have in place procedures to comply with all EU Directives
for the handling and disposal of timber sleepers and detailed
instructions are provided to the user. For further information
see this extract (Section 3)taken from the
Directive 2001/90/EC on marketing and use of creosote.
HOME
| INSTALLATION | SAFETY
CRITICAL | RAIL PLANT | TRAINING
| MATERIALS | SEQ | CAREERS
| CONTACT US